Table 2. Mixing Procedure

Step Time (min:sec) Revolutions per minute (RPM) Action
Stage 1 0:00-0:30 15 Rubber
0:30-1:30 30 Silica and chemicals
1:30-1:40 30 Sweep
1:40-5:30 Variable Mixing and Silanization (during 3 min at 155°C)
5:30 Variable Dump at 155°C after silanization reaction
Sheeting - Two roll mill
Stage 2 0:00-0:20 15 Compounds of stage 1
0:20-1:00 30 Add sulfur, cure accelerator
1:00-2:00 30 Extra mix and dump (under 100°C)
Sheeting - Two roll mill